STANDARD GRAVITY BOX TARP INSTALLATION MANUALJ. & M. Mfg. Co., Inc.P.O. Box 547 Fort Recovery, OH 45846Ph: (419) 375-2376 Fax: (419) 375-2708www.
9STEP 8 - TARP BOWS8.1 Tighten the Small Cable Clamp close to one end of the 3/16” diameter cable.8.2 Pull the opposite end through the center hole
STEP 8 - TARP BOWSSTEP 9 - CABLE10STEP 10 - PLASTIC STANDOFFSUsing 1/4” x 1 1/2” self tapping screws mount the Plastic Standoffs 2” below the drip edg
11STEP 12 - STOP BRACKETS12.1 Center the 1” Square Tube that is riveted to the Canvas Tarp on the CS of the gravity box. Allow the Square Tube to h
STEP 12 - STOP BRACKETS12STEP 14 - U-JOINT & CRANK HANDLE14.1 Install the Universal Joint using two 3/8” x 2” bolts and two 3/8” locknuts.14.2 I
13Common Roll Tarp PartsDescription Part No. Qty.Nylon Strip JM0001471 1Stop Bracket JM0001494 3Prop Up Bar JM0000917 2Plastic Standoffs JM0001496 2J
1ROLL TARP ASSEMBLY# Description1 Tarp Crank Handle Small2 1” x 1” 14 GA Square Tubing 3 1.25” x 1.25” Roll Tube 4 Spring Return5 Lip Lock 6 Back End
2ROLL TARP ASSEMBLYROLL TARP ASSEMBLYACDEFGB
3SPRING RETURN ASSEMBLYSTANCE # Description Part # Qty.1 1/4-20 X 1.0 Grade 5 Zinc Hex Bolt JM0002095 22 1/4-20 X 1 1/2 Grade 5 Zinc Hex Bolt JM000244
4STANCE CS (Chute Side)OCS (Opposite Chute Side)BackFront
5STEP 1 - HANGER1.1 Mark two holes using the Hanger Bracket as a template and drill with a 3/8” drill bit. These holes should be centered on the bac
STEP 1 - HANGER6STEP 2 - ENDCAPS ASSEMBLY2.1 Aside from the gravity box, match up the holes on the Front Endcap Arch with the top Front Endcap Plate
7STEP 4 - ENDCAPS3.1 Rest the lip lock OCS and centered on the top of the Gravity Box. 3.2 Rest the assembled front and back Endcaps in place.440/540
STEP 4 - ENDCAPS8STEP 5 - ENDCAPS CONTINUEDSTEP 6 - SPRING RETURN 5.1 Use the four holes on the top of the front Endcap as a guide to drill four hole
Kommentare zu diesen Handbüchern